Dang, it got warm!

I started this blog because I thought I would not keep a journal current. It seems keeping the blog current is tough too. Since my last post the house has been wired, insulated, and almost plumbed. The garage/studio has been framed. the septic field was completed and is now green with grass. Today the septic tanks were placed. The stairs from the lawn to the pool house terrace behind the house have been constructed and the the forms for the swimming pool have been installed. The stone work on the east elevation of the house is complete and the south side is 75% complete. All the flooring on the first floor has been installed. The roof is coming along. Yesterday we had our second blower door test. Found a few leaks but overall it went well. Next week blue board starts! It occurred to me that I have not posted plans of the house or the site and will do so shortly. The really great news is we have wonderful young couple who are going to purchase our existing house. It will be hard to leave our home of 20 years, but i think we are leaving it great hands.

South Elevation Studio Garage

South Elevation Studio Garage

Garage East Elevation

Garage East Elevation

Septic field complete

Septic field complete

Copper chimney caps

Copper chimney caps

Pool house doors

Pool house doors

Swimming pool forms

Swimming pool forms

<