Great progress inside and out

Much has happened since my last update. The second floor has been completely plastered. The first floor should be completely plastered by next week. The windows in the second floor studio above the garage have been installed as well as the gable end shingles. The mechanical system for the studio has been installed in the attic. The garage roof is about 75% complete and the garage doors have been ordered. The footings, piers, and block work for the front stoop, planters, and porte cochere have all been installed. The exterior doors for this end of the house are being fabricated.
Around back the pool has been gunited, mostly backfilled, and plumbed and wired. Next the interior will be waterproofed and the coping tile will be installed. The interior finish we selected for the pool is very fine black pebbles with a smattering of dark blue and tan. We think it will fit well with the pool’s natural surroundings. And finally, the SS stanchions for the cable rail system on the pool house roof deck have been installed so the insulation and roof membrane can be installed. I’m starting to get excited about powering up all the systems and seeing what we have wrought!

Septic field

There is a new septic field under that grass

Pool has been gunited, plumbed, and wired

Pool has been gunited, plumbed, and wired

West Bedroom ready for floor sanding and paint

West Bedroom ready for floor sanding and paint

Garage is getting roofed

Garage is getting roofed

Footing for front stoop with planters and support for port cochere

Footing for front stoop with planters and support for port cochere

South facade is complete and ready for deck

South facade is complete and ready for deck