Copper, stone and glass
Yesterday the masons removed the tarps from the big chimney.

Stone cladding on the big chimney
After a two month wait since the windows were delivered, the plywood has come down and the living room door and sidelites have been installed.

Double French door and sidelites at south side of living room
The installation of the standing seam copper roof has begun. There was a lot of prep work required before the panels could be installed, but things should start flying now.

Beginning of the copper standing seam roof