Copper, stone and glass
Yesterday the masons removed the tarps from the big chimney.
![Stone cladding on th](https://gacrockett.com/wp-content/uploads/2014/03/Chimney-552x980.jpg)
Stone cladding on the big chimney
After a two month wait since the windows were delivered, the plywood has come down and the living room door and sidelites have been installed.
![Double French door and sidelites at south side of living room](https://gacrockett.com/wp-content/uploads/2014/03/LR-Doors-3-980x552.jpg)
Double French door and sidelites at south side of living room
The installation of the standing seam copper roof has begun. There was a lot of prep work required before the panels could be installed, but things should start flying now.
![Beginning of the copper standing seam roof](https://gacrockett.com/wp-content/uploads/2014/03/Copper-roof-980x552.jpg)
Beginning of the copper standing seam roof