Copper, stone and glass
Yesterday the masons removed the tarps from the big chimney.
After a two month wait since the windows were delivered, the plywood has come down and the living room door and sidelites have been installed.
The installation of the standing seam copper roof has begun. There was a lot of prep work required before the panels could be installed, but things should start flying now.